![](https://i0.wp.com/flexmanager.ca/wp-content/uploads/2023/02/Risk-Register-Main.png?resize=1024%2C1004&ssl=1)
Safe Working Method Statement
- Identify steps required to initiate a specific activity or task in a safe manner.
- Assess the likelihood and severity of risks and plan control measures to eliminate these risks.
- Central Management system to record hazards by category and location.
- Documents describing control measures and safety precautions and how they can be implemented.